Facade

Garage door installation

Garage door installation – involves obtaining all the necessary measurements, preparing the opening and floor for mounting swing, sectional and roller models of gates. After preparation, there is a stage of marking the mounting locations and trying on the structure, and then assembling and mounting it.

The final stage is debugging the operation of the systems, programming the automation and remote controls. All these activities can be completed by specialists within a few hours.

The garage doors, the installation of which is discussed on this page, can have different locations of the main driving mechanism, as well as the angle of inclination and refraction of the guides.

Each object must be approached individually, so you can choose different types of opening: strictly vertically upward (straight) in the presence of high ceilings, and at an angle close to the slope of the roof.

Below we will consider the most popular manufacturing options at private facilities with torsion springs:

  • Low type – the shaft is located on the end crossbar of the horizontal guides.
  • Standard – the rounding of the guides is carried out at a height of 210 mm from the top point of the web, directly above the opening.
  • High – involves raising the horizontal guides above the opening within 900-1500 mm with the shaft located in the same plane as the closed web.

Garage door installation – installation features


Installation of automatic garage doors requires careful preparation, the availability of special tools and knowledge regarding the technical features of the design and mounting methods. In addition, you must have programming and coding skills.

For section designs, you will need to prepare an opening. Then you should apply markings and determine the mounting locations. After that, mount the guides and assemble the web. Alternately connecting the sections, you should check the level to prevent distortions of the slats and the web as a result.

Seals are used to eliminate gaps. The final stage is the assembly of the lifting mechanism, automation and debugging of their operation. The assembly algorithm for roller models is similar in actions, but it is somewhat faster and the cost is usually cheaper.

Swing products require fastening the welded frame in the opening using anchors. It is also necessary to secure hidden hinges for hanging the sashes, aligning their angle of inclination.

It is necessary to provide clamps to secure the canvas in the open state and prevent penetration of strangers from the outside. The design can also be equipped with automation, and in this case, electrical supply and debugging of the system will be required.

Leave a Reply

Your email address will not be published. Required fields are marked *